Raise/lower Elevators
Couldn't load pickup availability
Description
Description
Venning Elevator for hardening rack system, consists of two elevator towers that are installed before a rack system with finger car system, in connection with block production.
Elevator 1 stacks up mold plates with newly molded products, ready for pickup by Fingercar. After products have been dried in the racking system, the dry products are delivered to Elevator 2, which stacks down mold plates with dry products. The mold plates are then ready for further transport in production.
Elevator lifts two molding boards at a time. Chains on the right and left sides are mechanically fixed in relation to each other, so chains will always have the same height on both sides.
Produktion
Produktion
Vores produktion foregår både internt og hos tætte samarbejdspartnere, hvor vi fremstiller alt fra enkeltkomponenter til nøglefærdige, kundespecifikke løsninger.
Ved hjælp af 3D-tegneprogrammet Autodesk Inventor sikrer vi et præcist og optimeret produktionsgrundlag, der minimerer fejl og skaber værdi for både kunden og Venning Maskinfabrik.
Projektledelse
Projektledelse
Vi hos Venning Maskinfabrik prioriterer en tæt kundekontakt og sikrer professionel projektering og projektledelse gennem hele forløbet.
Vores dedikerede medarbejdere følger dine opgaver og projekter fra start til slut for at levere de bedste løsninger.

